Marine Terminal

Terminal Pavement Rehabilitation
As part of annual Marine Terminal maintenance, rehabilitation of asphalt surfaces is necessary to provide a safe working surface for Port users. Rehabilitation work is completed throughout the year on an as-needed basis when areas of failing pavement are identified and categorized.
 
 
Marine Terminal Light Pole Replacement 
The purpose of this project is to replace a cargo yard light pole damaged by Weyerhaeuser operations.  Work will include an assessment into the preferred location for the light pole.  Weyerhaeuser will be reimbursing the Port for its share of the costs.
 

Berth 1 Under Pier Evaluation & Repair


A recent examination and evaluation of berth one's structure for compatibility of the new mobile harbor crane indicated that the structures were deteriorating to the extent that many locations on berth one were deemed unsafe or unreliable for full utilization of mobile harbor crane operations.  Phase 1 of this work will fully identify the problems, solutions and estimated costs for bringing berth one up to full capability for which it was designed.  The phase 1 evaluation will also determine the urgency of addressing needed repairs and/or reconstruction.  Phase 2 of the project will complete the repairs identified in Phase 1.


Marine Terminal Stormwater Facility Improvements


In late 2014, the Port constructed, and put into operation, the Marine Terminal Stormwater Treatment Facility.  As operations of the facility continue, and overall efficiencies are monitored, there may be a need to enhance and/or upgrade components of the facility.  This project provides for a means of facility improvements, if warranted.
  
     
   
    
For additional information, please send inquiries to engineering@portolympia.com