Olympia Regional Airport

Taxiway F North Rehabilitation
The current alignment and condition of Taxiway F requires that a portion of the taxiway be relocated, with the remainder of the north area rehabilitated in order to meet FAA guidelines.


WSP Hangar Siding Repair and Reflash


The current condition of the hangar siding requires repair to preserve this Port asset. 


WSDOT Aviation Building Emergency Generator & Tiedowns


This project includes installing a backup generator that will support the WSDOT Aviation building, and 12 tie downs in the apron for aircraft.  Project costs will be cost-shared with WSDOT.


Maintenance Pickup Truck with Snow Plow


This project is an equipment purchase (pickup truck) that will replace aging airport equipment.  This purchase will also supplement the Port's snow-management equipment at the airport.


WSP Hangar Ramp & Parking Lot Improvements


The existing pavement at the WSP hangar for the aircraft ramp and vehicle parking requires preventative maintenance in order to minimize need for future replacement.  This project will crack seal and fog seal the aircraft ramp and vehicle parking lot.


WSP Hangar - Exterior Lighting Replacement


This project will replace the exterior aircraft ramp lighting area with energy efficient LED lighting.


WSP Hangar - Flooring Replacement
This project will replace office carpeting and bathroom vinyl flooring in the Washington State Patrol Hangar.
    
   

Pedestrian Gate - Hangar G


This project will install a pedestrian access gate, with combination pad, adjacent to Hangar G.
      
    
 
 